Project Description
Stormwater Basin Retrofits
This project illustrates I&L’s detention basin retrofitting experience to modify basin size, modify overflow structures, and add water quality BMPs. The City of Washington, MO retained I&L to retrofit current stormwater flood control basins at two locations – North of Eighth Street between Jefferson Street and Locust Street, and East of High Street between W 14th Street and Westridge Drive.
In this ongoing project, the stormwater BMP objective is to modify the existing flood control basins to improve existing deficiencies, minimize overflow, and increase water quality and treatment.
At the 20,000SF High Street location, streambank erosion and flooding were occurring downstream of the basin during frequent storm events, adversely affecting residential properties. The I&L team is modifying and retrofitting the basin to reduce frequent flows and maintain large storm performance while providing protection and positive aesthetics to the nearby residents. The basin will be enlarged to increase capacity.
At the 14,000SF Eighth Street location, the I&L team is assisting new commercial development to replace a portion of the nearby open drainage area. The modifications to the bioretention basin include the addition of two forebays and a bioretention cell. Bioretention cell provides creek protection flow control in addition to water quality benefits.
The final design includes two retrofitted basins with improved drainage design as well as new commercial development and two basin berms at one of the locations. The overall project illustrates I&L’s bioretention retrofitting experience to improve stormwater management, efficiency, and quality for the betterment of the ecosystem as well as commercial and residential areas.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Mark Meyer, PE, CFM
- Matt Auld, PE, ENV SP
Project Features:
- Stormwater
- Flood Control Analysis
- Water Quality Treatment
- BMPs
- Bioretention Basins
- Erosion Control
- Final Design, Plans, and Specifications
- Permitting
Year:
- Design: 2024
- Construction: 2025