Project Description
Riverside Park Sanitary Design
St. Charles County Parks Department retained Intuition & Logic Engineering to design Riverside Park, its newest facility at the confluence of Dardenne Creek and the Mississippi River. Intuition & Logic is the lead firm providing planning and civil engineering and the team includes Ross & Baruzzini for architecture, electric and plumbing. The park features a dual boat lanch with ADA loading platform, courtesy boat docks, 21 full service RV campsites, fire pits, tent camping, fishing, kayak launch with ADA loading dock, park roadway and parking, circulation trail, council ring with river overlook, full service comfort station, and much more.
The sanitary sewer system included alternatives analysis and design of a 2,800 ft low head force main system with lift stations and wet wells to an off site infiltration field.
The water system includes the well, well head, water treatment facilities, mechanical room, and 2,300 ft water distribution system. The water treatment and mechanical room and is elevated above the 1% annual chance of exceedance flood elevation.
Bid alternatives included design for a gravity system to two 15,000 gallon on site storage tanks with wet wells and pumping and a water bid alternative for a shallow, non-potable well head with elevated well housing containing storage tanks, mechanical room and distribution to three hose bibs for park service use.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Matt Auld, PE, ENV SP
- Mark Meyer, PE, CFM
Project Features:
- Pump Stations
- Sanitary Sewer System
- Water
- Utilities
- Final Plans and Specifications
- Permitting
Year:
- Design: 2019
- Construction: 2020