Parks and Trails, Potable Water, Sanitary Project

Missouri River Boat Dock at Klondike Park

Project Description

Missouri River Boat Dock at Klondike Park

The Missouri River Boat Dock Design project highlights Intuition & Logic’s expertise in boat dock design, waterfront infrastructure, river access improvements, bank stabilization, and recreational facility design.

St. Charles County Parks & Recreation retained Intuition & Logic Engineering to design a new public boat dock at Klondike Park along the Missouri River. The project was developed to improve river access and provide additional amenities for boaters, anglers, paddlers, and other recreational users visiting the park.

The new dock is approximately 100 feet long and is located immediately downstream of the existing boat ramp. As a result, the facility serves as a convenient courtesy dock for loading and unloading watercraft while also providing fishing access and enhanced recreational opportunities for park visitors throughout the region.

Missouri River Boat Dock Design

The Missouri River presents unique engineering challenges due to significant fluctuations in river levels throughout the year. Therefore, the dock system was designed to accommodate changing water elevations while maintaining safe and reliable public access.

The floating dock is mounted to a network of guide pilings that allow the structure to rise and fall with river conditions. Additionally, the system was designed to accommodate river stage fluctuations exceeding 38 feet.

Project features included:

• 100-foot floating boat dock
• ADA-accessible gangway connections
• Guide piling system
• River access improvements
• Courtesy docking facilities
• Recreational fishing access

Riverbank Stabilization and Site Improvements

In addition to the dock structure, the project included shoreline improvements intended to protect the riverbank and support long-term facility performance.

Site improvements included:

• Riverbank stabilization measures
• Debris deflection boom installation
• Asphalt trail connections
• Pedestrian access improvements
• Site grading and drainage considerations

Furthermore, the debris deflection system helps protect the dock from floating debris commonly found within the Missouri River during high-flow conditions.

Environmental and Recreational Considerations

A major design objective was minimizing impacts to the existing natural environment while improving public access.

Consequently, the gangways and connecting asphalt trails were carefully routed between existing trees to preserve natural vegetation along the riverbank. This approach minimized disturbance while maintaining the character of the park and protecting valuable riparian habitat.

Additionally, solar-powered navigation beacons were installed at both the upstream and downstream limits of the dock. These beacons improve visibility for commercial and recreational river traffic while enhancing safety for all users.

Through a combination of boat dock design, riverbank stabilization, recreational access improvements, and environmentally sensitive engineering, Intuition & Logic helped create a durable and functional waterfront amenity that expands public access to the Missouri River at Klondike Park.

Project Details

Key Personnel:

  • Tim Dean, PE, LEED AP, CFM
  • Matt Auld, PE, ENV SP

Project Features:

  • Feasability analysis
  • H&H design
  • HEC-RAS Modeling

Project Gallery

Elizabeth Tiedt, EI

Project Engineer, Intuition & Logic Engineering, Inc.

Education

 

Registration

EI- Project Staff

Affiliations

 

 

Danielle Laurie, EI

Project Engineer, Intuition & Logic Engineering, Inc.

Education

B.S. Architectural Engineering & Civil Engineering

University of Missouri-Rolla, 2025

Registration

EI- Project Staff

Affiliations

  • American Society of Civil Engineers
  • American Public Works Association
  • Engineers Without Borders
  • Chi Epsilon

Ms. Laurie is a Civil and Architectural Engineer with a strong foundation in civil engineering analysis and design, supported by both academic and early professional experience. She has approximately 15 months of engineering experience, with a primary focus on civil engineering applications. Ms. Laurie has hands-on experience in modeling and analysis using industry-standard tools, including AutoCAD Civil 3D, ArcGIS, and PCSWMM. She has completed formal training in PCSWMM hydraulic modeling and has applied these skills to support stormwater management and hydraulic analysis efforts. Her technical experience includes civil site layout, stormwater hydrology and hydraulic calculations, utility coordination, and preparation of construction documents. Ms. Laurie has also assisted with construction-related activities, including design inspections, pavement inspections, and concrete testing.