Project Description
Wentzville Stone Meadows Lift Station Analysis
The Midland Creek project is 2,700 feet of highly incised and channelized urban stream. 100-year, 24-hour flow rates range from 3,100 cfs at the upstream limits to 5,200 at the downstream project limits. I&L provided Hydrologic, Hydraulic, and Geomorphic analysis through Final Engineering Design, Plans, and Specifications.
Final design included considerable earthwork and channel reshaping, coordination with sanitary sewers, public involvement, USACE, FEMA and local permitting, easements, construction haul routing and more. The design includes rock-toes and vegetated rock revetment slopes or rock toes and vegetated fabric and waddle slope bank stabilization. Grade control structures consist of rock-stabilized step-drop riffle structures and are intended to halt channel incision processes within the project reach.
Near one of the existing ball fields, a retaining wall was designed at the top of the stabilized bank to preserve the location of the existing dugout and backstop. 1D steady-state HEC-RAS model was developed to calculate final design hydraulics, flood modeling, and support permitting.
Project Details
Key Personnel:
- Matt Auld, PE, ENV SP
- Mark Meyer, PE, CFM
- Danielle Laurie, EI
- Seth Flipsen, EI
Project Features:
- Sanitary Sewer
- Sanitary Lift Station
- Initial Assessment TM
Year:
- 2026