Project Description
The Maline Creek Bank Stabilization project highlights Intuition & Logic Engineering’s experience in streambank stabilization, erosion control, and water resources engineering. Streambank erosion can threaten surrounding infrastructure, impact water quality, and contribute to channel instability.
Effective bank stabilization requires an understanding of hydraulic conditions, stream channel characteristics, and erosion processes. Intuition & Logic applies engineering expertise to develop practical solutions that support long-term channel stability and help protect surrounding infrastructure.
Streambank Stabilization and Erosion Control
Streambank stabilization projects may incorporate erosion protection measures, channel improvements, and vegetation-based stabilization techniques depending on site conditions. These approaches help address erosion concerns while supporting sustainable stormwater management and water resources protection.
Project Details
Key Personnel:
- Tim Dean, PE, LEED® AP, CFM
- Mark Meyer, PE, CFM
- Matt Auld, PE, ENV SP™
- Kevin Sallwasser, EI
Project Features:
- Flood Control design
- Hydraulic/Hydrologic Engineering
- Roadway and Yard Drainage
- ROW and Easements
- Permitting
- Utility Coordination
- Plans and Specifications
- Field Investigation
Year:
- Design: 2024
- Construction: 2025



