Project Description
Kirkwood Park Walker Lake Renovations
The Walker Lake Renovation Design project showcases Intuition & Logic’s expertise in lake renovation design, park improvements, shoreline stabilization, stormwater quality BMPs, and recreational amenity design in Kirkwood, Missouri.
Intuition & Logic served as the project civil engineer in partnership with Planning Design Studio (PDS) Landscape Architects for a multi-phased renovation of Walker Lake within Kirkwood Park. The project focused on enhancing water quality, improving recreational opportunities, restoring shoreline conditions, and upgrading park amenities while preserving the natural character of the lake and surrounding parkland.
The lake renovation design incorporated a variety of environmental, recreational, and infrastructure improvements. Below the normal pool elevation, the project included grading and habitat enhancements designed to improve aquatic health and support fish populations. Features included fish habitat structures, vegetated wetland shelves, aquatic benches, and spawning habitat improvements.
Additional shoreline and lake-edge improvements included:
• Lake edge treatments to improve fishing access
• Shoreline stabilization and erosion protection
• Natural stone retaining walls
• Wave action erosion control measures
• Natural stone channel improvements
• Waterfall feature with recirculating flow system
The project also incorporated numerous stormwater quality and site improvement elements designed to improve runoff treatment and environmental performance throughout the park.
Stormwater and site improvements included:
Additional park amenity enhancements included tennis court resurfacing, gazebos, pedestrian improvements, and other recreational features that improve the visitor experience within Kirkwood Park.
Intuition & Logic prepared final construction documents and provided construction-phase services throughout each phase of implementation.
The completed project demonstrates the successful integration of lake renovation design, environmental restoration, stormwater management, and park amenity improvements to create a more functional and sustainable community asset in Kirkwood, Missouri.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Mark Meyer, PE, CFM
Project Features:
- Stormwater
- Parks & Recreation
- Trails
- Urban Channel Design
- Culvert Design
- Hydraulic and Hydrologic Engineering
- Pond Overflow Analysis
- Channel Erosion Control
- Hydraulic Structure Design
- Water Quality
- Flood Analysis
- Hydrologic Modeling
- Cost Analysis
- Habitat Evaluations
- Final Plans and Specifications
- Easements
- Permitting
- Construction Services
Year:
- 2008-2019
Team:
- Planning Design Studio (PDS)
















