Kirkwood Park
The Kirkwood Park Amenity Design project highlights Intuition & Logic’s expertise in park amenity design, lake improvements, stormwater quality BMPs, recreational infrastructure, and construction services.
Intuition & Logic served as the project civil engineer in partnership with Planning Design Studio Landscape Architects for renovations and improvements throughout Kirkwood Park in Kirkwood, Missouri. The project focused on enhancing recreational amenities, improving environmental performance, and creating a more functional and sustainable park experience for visitors.
As part of the park amenity design, the project included extensive lake improvements intended to enhance aquatic habitat, improve water quality, and expand recreational opportunities. The lake renovation components incorporated grading below the normal pool elevation to create fish habitat, vegetated wetland shelves, aquatic benches, and spawning areas that support long-term ecological health.
Additionally, shoreline improvements were designed to improve public access while protecting the lake from ongoing erosion. These enhancements included:
• Lake edge treatments for fishing access
• Shoreline stabilization and erosion protection
• Wave action protection measures
• Natural stone retaining walls
• Habitat enhancement features
Furthermore, the project included construction of a natural stone channel and waterfall with a recirculating flow system that serves as both a functional water feature and an attractive park amenity.
Stormwater management and water quality improvements were also integrated throughout the site to improve runoff treatment and environmental performance.
Stormwater and site improvements included:
• Permeable paver parking lot design
• Multiple bioretention cells
• Proprietary prefabricated bioretention systems
• Hydrodynamic separator installation
• Stormwater quality BMP implementation
• Drainage improvements
• Site grading enhancements
In addition to environmental improvements, the project included upgrades to recreational infrastructure throughout the park. Roadway resurfacing, parking lot improvements, tennis court resurfacing, and other park enhancements were incorporated to improve accessibility, safety, and visitor experience.
Intuition & Logic prepared final design plans, construction documents, and technical specifications for the project. Throughout construction, the team also provided construction-phase services to support implementation and ensure project goals were successfully achieved.
Through a combination of park amenity design, lake restoration, stormwater management, recreational facility improvements, and construction services, Intuition & Logic helped create a more sustainable, functional, and enjoyable community destination within Kirkwood Park.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Mark Meyer, PE, CFM
Project Features:
- Stormwater
- Parks & Recreation
- Trails
- Urban Channel Design
- Culvert Design
- Hydraulic/Hydrologic Engineering
- Pond Overflow Analysis
- Chanel Erosion Control
- Hydraulic Structure Design
- Flood Analysis
- Hydrologic Modeling
- Cost Analysis
- Habitat Evaluations
- Final Plans and Specifications
- Easements
- Permitting
Year: 2008 – 2015