Project Description
Grand Glaize Creek Bank Stabilization – Metropolitan St. Louis Sewer District
This project illustrates I&L’s flood and erosion control as well as channel and construction management experience. The Metropolitan St. Louis Sewer District (MSD) engaged I&L to plan and design bank protection to stabilize the bank and control the erosion threatening MSD’s Grand Glaize Waste Water Treatment Facility and flood protection wall.
The project site is on the outside of an advanced bend with a bank slope of approximately 1.2H:1V for a vertical height of 30 feet. The toe of slope is located in a 6 foot deep backwater from Simpson Lake as well as within the regulatory floodway. The erosion was occurring immediately upstream of Simpson Park and near the confluence with the Meramec River. Erosion at the toe of the slope caused bank slumping, which had undercut the vegetation at the top of the bank by several feet. Bank scour and erosion was near continuous along this widening reach and a 300 foot long section of the bank is within 30 feet of the existing floodwall.
I&L reviewed GIS information and H&H Modeling prior to performing a field investigation to review alignments and geomorphic field conditions. A rock-lined slope with an enhanced rock toe was found to be a good solution for the erosion issue, along with vegetation and livestakes. I&L engineers recommended slightly extending the work area, both upstream and downstream from the affected area to provide tie-in locations in a stable area.
The proposed solution was a combination of laying back the slope to a 2.5H:1V slope and an 8 foot tall modular block retaining wall. The lower slope consisted on an enhanced rock toe section that extended below the scour depth in the channel and was widened to add additional resisting mass to the bank section for global stability. The upper slope was stabilized with native riparian plantings and covered with an erosion control blanket and straw wattles.
I&L was the lead firm providing project management, identifying and developing alternatives, alternatives analysis, engineering design, HEC-RAS, HEC-HMS, final design plans in AutoCAD Civil 3D, specifications, permitting including FEMA No-Rise Certification and USACE 404, cost, and bidding support services.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Matt Auld, PE, ENV SP
- Jenna Stombaugh, EI
- Kevin Sallwasser, EI
- Lorelei Wilson, EI
- Mark Meyer, PE, CFM
Project Features:
- Flood Control design
- Channel Stabilization
- Hydraulic/Hydrologic Engineering
- Roadway and Yard Drainage
- ROW and Easements
- Permitting
- Utility Coordination
- Plans and Specifications
- Field Investigation
- Cpital Improvement Projects
- Report Preparation
Year:
- Design: 2022-2023
- Construction: 2023-2025