Project Description
Arnold, MO June Drive Stormwater
This project illustrates I&L’s flood control alternatives analysis and pump station design capabilities. The City of Arnold, MO retained I&L to evaluate stormwater ponding and residential flooding along June Drive. Project objectives were to eliminate ponding, minimize number of impacted parcels, and minimize utility impacts.
The June Drive Stormwater Alternatives Analysis develops options to eliminate yard flooding in the rear yards of 450 June Drive, 456 June Drive, 451 Nancy Lane, and 457 Nancy Lane. The property at 456 June Drive is owned by the City and is available to support potential project improvements.
Five alternatives were considered to address the ponding and meet project objectives:
- Overland Flow Swale
- Pipe to West
- Pipe to East
- Basin and Pump Station
- Buyout
Final plans were developed for a detention basin and pump station to pump stormwater from the basin to the existing enclosed stormwater system. The design included grading, pump vault, pipe, manholes, roadway, and site restoration.
Project Details
Key Personnel:
- Tim Dean, PE, LEED AP, CFM
- Matt Auld, PE, ENV SP
- Mark Meyer, PE, CFM
Project Features:
- Alternatives Analysis
- Pump Station design
- Flood Control design
- Hydraulic/Hydrologic Engineering
- Roadway and Yard Drainage
- ROW and Easements
- Permitting
- Utility Coordination
- Plans and Specifications
- Field Investigation
Year:
- Design: 2022-2023
- Construction: 2023-2024